On this page, you can see examples of the stellar results we achieve at Loftus QLD in Gladstone. Whether the project entails civil construction, demolition, plant hire, regulated waste management, concreting or anything else, we'll get it done to the highest standard. We make sure our fleet is meticulously maintained and we only use advanced equipment.
If you like what you see and want to book a service with our team, get in touch today. You can call us on 0499 342 895. Our services are available throughout Gladstone and surrounding regions in Central Queensland.
The Auckland Hill Stage 2 Re-development project, undertaken by Loftus Contracting Pty Ltd for the Gladstone Ports Corporation, involved comprehensive enhancements to Auckland Hill. Key features included the construction of the Northern Viewing Platform, a disabled access ramp and stairway, and the development of a southern garden bed. The project also encompassed refurbishment of the existing kiosk, improvements to roadways and car parking facilities, as well as the establishment of concrete pathways with handrails. Additionally, the installation of underground service conduits and pits was integral to modernizing the infrastructure. The project was executed with a focus on safety, functionality, and improving the overall aesthetics and utility of Auckland Hill.
The Round Hill Road project, Loftus Contracting Pty Ltd executed significant road and civil works for the Gladstone Regional Council. This involved upgrading and expanding the road infrastructure across multiple stages, including earthworks, paving, drainage improvements, and installing safety features. The project focused on enhancing road durability, capacity, and safety, ensuring a more efficient and secure travel experience for the Gladstone community. The work was carried out with strict adherence to quality and environmental standards, reflecting Loftus Contracting's commitment to excellence in civil engineering.
Scope: This General Works Supply Contract covers the design, supply, and construction of a storage shed at the Port of Bundaberg. It outlines the contractor's responsibilities, including methodology, quality assurance, and compliance with laws. Key terms include conditions for practical completion, time extensions, and obligations concerning safety, environmental management, insurance, and dispute resolution. The contract emphasizes adherence to contractual obligations and regulatory requirements.
Loftus Contracting Pty Ltd has completed the Toolooa Street Critical Sewerage Rising Main Renewal project for the Gladstone Regional Council. The project involved a systematic approach, starting with excavation, trenching, and benching out. HDPE pipeline installation followed, ensuring a secure and reliable sewerage system. Backfilling was then carried out with suitable materials, maintaining system integrity. Finally, pavement renewal was conducted, including excavation, disposal of existing pavement, installation of new layers, and application of asphalt pavement and linemarking. Loftus Contracting's adherence to safety and environmental regulations has contributed to the enhancement of local infrastructure, benefiting the Gladstone community.
Loftus Contracting Pty Ltd has completed the Toolooa Street Critical Sewerage Rising Main Renewal project for the Gladstone Regional Council. The project involved a systematic approach, starting with excavation, trenching, and benching out. HDPE pipeline installation followed, ensuring a secure and reliable sewerage system. Backfilling was then carried out with suitable materials, maintaining system integrity. Finally, pavement renewal was conducted, including excavation, disposal of existing pavement, installation of new layers, and application of asphalt pavement and linemarking. Loftus Contracting's adherence to safety and environmental regulations has contributed to the enhancement of local infrastructure, benefiting the Gladstone community.
Loftus Contracting Pty Ltd has completed the Gladstone Ports Corporation project for the installation of guardrails at Port Alma Wharf. The project included the fabrication of precast kerb units offsite, site establishment, and preliminary works, as well as site installation and modifications. Precise execution and adherence to project specifications ensured the successful completion of the guardrail installation, enhancing safety and functionality at Port Alma Wharf.
Loftus Contracting Pty Ltd has carried out the demolition works for the ANZAC Park Redevelopment project. The scope of work involved the demolition of various buildings and structures within the park, ensuring compliance with safety and environmental regulations. In addition, Loftus Contracting handled the removal and disposal of asbestos-containing materials and coordinated disconnections of utilities such as electrical, water, and sewer mains. The demolition project aimed to pave the way for the planned redevelopment of ANZAC Park, which would enhance its usability and attractiveness for residents and visitors.
Loftus Contracting Pty Ltd has completed the Aldoga Water Pipeline project for the Gladstone Area Water Board. The project involved excavation, installation, backfilling, and tie-in works. Excavation included trenching for the pipeline, followed by the precise installation and fitting of the new pipeline. Backfilling involved refilling the trenches with suitable materials, and tie-in works ensured proper connection to existing infrastructure. The successful completion of the Aldoga Water Pipeline project showcases Loftus Contracting's commitment to delivering high-quality projects while adhering to safety and environmental standards, benefiting the Gladstone Area Water Board and the community it serves.
Loftus Contracting Pty Ltd has completed the works for Powerlines Plus at the Aldoga Gem Facility. The scope of work included site preparation, earthworks, installation of underground services, and civil works with backfilling. Site preparation involved clearing obstacles and setting up structures, while earthworks encompassed trenching and foundation excavation. The installation of underground services was carried out meticulously to meet facility requirements. Civil works involved the construction of equipment structures and roads, with proper backfilling of trenches. Loftus Contracting's successful completion of the works at the Aldoga Gem Facility demonstrates their commitment to delivering high-quality projects, contributing to the functionality and efficiency of the facility for Powerlines Plus.
Loftus Contracting partnered with the Gladstone Regional Council to replace the aged chain wire fence at the Gladstone Aquatic Centre. This project aimed to enhance safety, meet pool safety regulations, and improve the facility's appearance.
Key project elements:
We ensured Aquatic Centre security during work, minimising disruptions to operations. Loftus Contracting's commitment improved safety, functionality, and appearance of the facility
Loftus Contracting partnered with Gladstone Area Ports Corporation to execute a comprehensive project that included facility refurbishments and construction, focusing on quality, safety, and environmental considerations. Key objectives encompassed:
The project's phases involved meticulous pre-site preparation, secure site possession, phased construction and demolition with milestone handovers, and final disestablishment steps. Our resource allocation ranged from -8 personnel based on project stages. The project showcased Loftus Contracting's commitment to excellence while adhering to industry best practices, and included the procurement of designer items as per GIW Designs concept.
Loftus Contracting successfully completed the Rockhampton River Deck project for the Rockhampton Regional Council, involving a range of construction phases and tasks. The project encompassed:
Additional tasks included:
The project was executed with meticulous attention to detail and adherence to high-quality standards, resulting in a successful collaboration with the council.
Loftus Contracting completed the comprehensive concrete works project for Alpha HPA within the Utilities Area. The project encompassed a diverse range of tasks that spanned from initial preparations such as SWMS development and induction procedures to the effective mobilisation of resources. Notably, the project featured a series of intricate concrete-related assignments, each requiring a unique skill set and meticulous execution. Among the notable tasks, the execution of the Cooling Water Slab showcased Loftus Contracting's ability to handle complex concrete structures with precision. The Isotainer Strip Footings and Slab installation further underscored their proficiency in managing intricate components of the project. Equally impressive was the precise installation of the LPG Tank, a testament to their technical competence and attention to safety regulations.
Loftus Contracting effectively carried out the refurbishment of the Marina Admin Building and Park Visitor Underground Toilet for Gladstone Ports Corporation. Loftus Contracting’s approach involved a comprehensive Project Management Plan, ensuring safety, environmental compliance, and quality. The process encompassed site setup, possession, construction works, and meticulous steps for each site, including tasks like:
This methodical approach was consistently applied across various components of the project, guaranteeing efficient execution and timely completion.
ABN: 51 635 498 994